Change an activity type

Use this procedure to change an existing activity to a different activity type. For example, change a normal activity to a .NET activity.

  • Once you change an activity to an automatic activity, the resources assigned to the activity are removed.

  • You cannot change the activity type for the following activity/nodes:

    • Embedded Process Activity

    • Decision Node

    • Start Node

    • End Node

  1. Select the activity.
  2. In the Properties panel, on the Type list, select the activity type.
  3. Click Save.

    The settings previously configured for the activity are automatically applied to the changed type; configure only the properties specific to the changed activity type. See Activity types.