Global calendar for components

When you work with your data, type "Calendar" in the Property Panel and select the applicable calendar from the list. For more information about setting calendars, see the Kofax Insight Admin Console Help.

After your selection is applied to the chart, the data is shown according to the calendar working hours.

If the component’s time is based on "Interval of (to current time/to last available date of metric)" and a calendar is applied to the component, the component interval contains the number of working days specified.

For example, if you want "Show me 7 days going back from Fri 08/21" and apply a standard calendar, the result interval is not 08/14 - 08/21; it is 08/12 - 08/21 because the interval includes 2 non-working days. After calculating the data for such component, the results for non-working days or holidays are excluded.

However, if you calculate a total value for the same period, it includes all holiday values.

The calendars do not affect components without time drill-down for less than a week. Also, paging in grids may not work correctly if the "calendar data reduction" is selected.

For such cases, in the expression editor for a record derived field, select "DATE_DIFF_BUSINESS_DAYS," "DATE_DIFF_BUSINESS_HOURS," and "DATE_DIFF_BUSINESS_MINUTES" functions that return the period based on the calendar selection.